Saltar al contenido principal
CríticasCineStreamingPremiosFestivalesCatálogo
Bad River

Equipo técnico

Bad River equipo técnico completo

Wisconsin's tribe's ongoing fight to protect Lake Superior for future generations. "Bad River" shows the Bad River Band of Lake Superior Chippewa's long history of activism and resistance in the context of continuing legal battles with Enbridge Energy over its Line 5 oil pipeline. The Line 5 pipeline has been operating on 12 miles of the Bad River Band's land with expired easements for more than a decade. The Band and the Canadian company have been locked in a legal battle over the pipeline since 2019.

Película
2024
1h 38m
Dirección: Mary Mazzio
Documental

¿Qué equipo técnico acompaña a Bad River?

Esta página agrupa la dirección, guion y el resto de los departamentos técnicos disponibles para Bad River.

40 créditos técnicos